For using trainman further, please install chrome extension for it to work effectively
Date:
passenger express

Lar Road to Indara Jn trains

<     >
Train Dep Arr Travel M T W T F S S 1A % 2A % 3A % 3E % SL % CC % 2S %
CHAURICHAURA EXP
15004
01:23
LRD
02:04
IAA
00:41 M T W T F S S Status
% Status
% Status
% - - Status
% - - - -
GKP LTT EXP
15018
07:41
LRD
08:18
IAA
00:37 M T W T F S S Status
% Status
% Status
% - - Status
% - - - -
LJN BCY EXPRESS
15008
08:47
LRD
09:36
IAA
00:49 M T W T F S S Status
% Status
% Status
% Status
% Status
% - - - -
Bhatni Varanasi City Passenger (UnReserved)
55137
15:50
LRD
16:40
IAA
00:50 M T W T F S S - - - - - - - - - - - - - -
BSBS INTERCITY
15103
18:20
LRD
19:02
IAA
00:42 M T W T F S S - - - - - - - - - - Status
% Status
%
Chhapra Kacheri Mau Passenger (via Bhatni) (UnReserved)
55101
19:57
LRD
20:54
IAA
00:57 M T W T F S S - - - - - - - - - - - - - -
Interesting facts about Lar Road to Indara Jn trains

6 trains run from Lar Road to Indara Jn .
The fastest train from Lar Road to Indara Jn is 15018 GKP LTT EXP which travels a distance of 40 kms in just 37 minutes.
The most punctual train in this route is which reaches with an average delay of just NA.
The least punctual train in this route is which reaches with an average delay of NA.
The minimum fare for trains from Lar Road to Indara Jn is Rs 1165 in First AC (1A), Rs 700 in Second AC (2A), Rs 495 in Third AC (3A), Rs 145 in Sleeper (SL), Rs 260 in Chair Car (CC) and Rs 45 in Second Seater (2S) in general quota.
Tatkal ticket fare and premium tatkal fare in this route starts from Rs 1540 in Second AC (2A), Rs 1105 in Third AC (3A), Rs 395 in Sleeper (SL), Rs 515 in Chair Car (CC) and Rs 75 in Second Seater (2S).
Important railway stations in this route are Bhatni Jn, Belthara Road, Aunrihar Jn, Prayag, Satna, Sihora Road, Gadarwara, Pipariya, Khandwa and Manmad Jn.
Lar Road has 1 stations namely Lar Road while Indara Jn has 1 stations namely Indara Jn.
Note:
  • Colored clock icon under Dep and Arr column signify punctuality of the train based on average delay over last 7 days.
        - Average delay is more than 2 hours.     - Average delay is less than 2 hours.
  • RAC is considered as confirmed for evaluating confirmation chances.
  • Colors under confirmation chances mean following:
       Red - Not likely to confirm.    yellow - Difficult to say if this will confirm or not.    Green - Very likely to confirm.
  • Seat availability and berth status functionality may not be available between 11:30 pm and 12:30 am.
  • Disclaimer - Trainman is in no way affiliated to Indian Railways, therefore some times, the information shown may not be accurate. Trainman also does not claim 100% accuracy on any prediction done for waitlisted tickets.